Encanto Immersive Experience

A 40 ft walkthrough of the Madrigal family's Casita, designed, fabricated, and installed in two months to open for the film's North American release weekend.

Client / context
For Disney's Canadian theatrical campaign, via Simon Pure Marketing

Location
Toronto

Completed
November 2021

Delivered by
Juiceworks Exhibits

My role
Project Director

Stages
Design Development to Handover (RIBA 3-6)

The brief

Disney's Canadian theatrical campaign for Encanto needed a free, public centrepiece that would introduce families to the Madrigal family and their Casita around the film's opening weekend. Simon Pure Marketing, the agency producing the campaign, brought the creative concept and appointed Juiceworks Exhibits as design-build partner to make it real. The film's release date was fixed, so the installation date could not move: about two months from design development to opening, with one overnight window to install into an operating public venue.

The idea

A 40 ft walkthrough can't hold a house, so we built depth rather than volume. Each bay presented a family member's room as a die-cut graphic wall, with three-dimensional scenic elements layered in front to create real parallax, shadow, and silhouette. The characters were printed directly onto clear acrylic and cut to their outlines, so each one stood free of its scene with a crisp, bright edge. Every bay was composed as a place to stand and be photographed with a character.

What I did

  1. Held overall accountability for delivery: the programme, the production budget, the site works, and the approvals path with the agency and Disney's brand and licensing reviewers.

  2. Planned the programme backwards from opening morning, with every approval gate dated, so long-lead print and acrylic production could be released early on the strength of approved samples.

  3. Put physical prototypes, not screen proofs, through approval, so full production was released once, without a reprint.

  4. Delivered the walkthrough as demountable, self-supporting modules with no fixing to the host building, installed overnight and snagged before the public was admitted. It opened on time for the release weekend.

About 40 ft long by 10 ft high

About two months from design development to opening

One overnight installation window

Previous
Previous

Glenn Martin, DDS

Next
Next

Themed Water Park, Interactive Layer